Arrived on March 31 at Kolding port, the preparation work was starting immediately - in particular during winter time Luffe Shipyards was upgrading the following things : Radar, Watermaker, Spinnaker boom, and few other adaptions. From our side the upgrades were : Iridium go with external antenna, seadoc medical kit, and to have all manuals in electronic version. Find a couple of photos below.